Invoice it from ServiceM8. See what each job made in Xero, bills and wages included.

ServiceM8 already sends your invoices and payments to Xero. What it leaves you is the other half: supplier bills keyed into Xero with no job attached, progress invoices tracked on a whiteboard, and a job profit figure nobody trusts. We connect ServiceM8 and Xero so every cost lands against its job and the margin is real.

Start with a free audit. Give us your website and we map the tools you run and where the same details get typed twice, before we speak.

The call takes thirty minutes. You keep the map whether or not you hire us.

ServiceM8 to XeroOne bathroom renovation, costed as it goes
  1. Supplier Wholesaler invoice for job 2207Tapware and fittings · PO 2207 · $1,846.20 + GST In
  2. Xero Bill drafted, coded to job 2207Materials account, job tracking set, PDF attached. Synced
  3. ServiceM8 Progress invoice 2 of 3 raised40% of the quoted $18,600 · rough-in signed off Synced
  4. Xero Labour on job 2207 costed31.5 hours from ServiceM8 check-ins, at real rates Matched
  5. Report Job 2207 margin updatedBilled $11,160 · costs $7,402 · margin 34% Updated
Job costing, every open jobFriday

23 open jobs costed from Xero bills and labour. 2 bills with no job number listed for the office.

Rebuilt every night

An example, with sample names and figures. We map your own systems in the free audit.

Trusted by businesses across Albury Wodonga and regional Australia

Pandora Frontline Trays & Trailers Chargeroo Angie Ioannou Commercial Real Estate Cycle Station TWJ Trades The Landscapers Rest DWA Ignition ASV Shiny Side Up Albury Florist Centre Lighting Bonanza Footsteps Podiatry Clean Energy Solutions

Change the job. Watch Xero follow.

Change a value in step 1 and step 2 updates. That is the work nobody has to retype.

1Change anything here

M8Job 2207, bathroom renovationTry it

2This happens on its own

Progress invoiceAuto
40% of the quote
$7,440.00
Tracking
Job 2207
Supplier bill, draftedAuto
Materials, coded to job 2207
$1,846.20
GST
$184.62
Attached
The supplier's PDF

With billing and costs on the same job, the margin report updates itself. Example figures. Nothing you type here is sent anywhere, and your own accounts and rules are agreed in step 1 of the build. Get this mapped on your own data.

What changes once they are connected.

The same work, before and after. Nothing on the right needs a person to start it.

Today: what it replaces Month end

The afternoon someone spends matching supplier bills to jobs and guessing which jobs actually made money.

  • Supplier bills keyed into Xero, job number in the notesper bill
  • Progress invoices tracked in a spreadsheetper stage
  • Job profit worked out at the end, if at allmonth end
  • Wages per job guessed from the diarynever exact
After we connect them Nightly

Every bill, labour hour and invoice tied to a ServiceM8 job in Xero, with margin per job ready before the Monday meeting.

  • Bills drafted in Xero with the job attachedauto
  • Each progress invoice checked against the quoteauto
  • Labour costed from job check-insnightly
  • Margin per job on one pageevery Monday
  • 24/7A supplier invoice emailed at 11pm is drafted and coded before the office opens.
  • 0Lock-in. Runs on your ServiceM8 and Xero logins. The mapping table and the code are yours to keep.
  • $2,500To start, live in 2 to 4 weeks. The range is in the questions below.

What moves between ServiceM8 and Xero.

Five jobs the connection does. Each one is something a person does by hand today.

01

Supplier bills land on the job, in Xero

Wholesaler invoices arrive as PDFs in the accounts inbox. We read each one, find the ServiceM8 job number in the PO or reference field, and draft the Xero bill with its lines, GST and the job attached. The PDF goes on the bill, so the cost is counted once, against the right job.

  • PO or reference matched to a ServiceM8 job number
  • Drafted as a Xero bill with the PDF attached
  • Bills with no job number held for the office, not guessed
02

Progress invoices against the quote

ServiceM8's partial invoicing add-on raises a deposit or a progress claim. It does not tell you how much of the quote is left, or warn you that a variation was never billed. We keep a running ledger per job: quoted, invoiced to date, paid and still to bill, checked before each claim goes out.

  • Deposit, stage and final invoices tracked against the accepted quote
  • Unbilled variations flagged before the final invoice
  • Paid status from Xero shown against each stage
03

Labour costed from the check-ins

In Australia, ServiceM8 can send shift times to Xero as timesheets. A shift is not a job, though. We take each person's job check-ins, cost them at their real rate with super and on-costs, and post the labour against the job, so a two-day job that took four shows up as one.

  • Check-in and check-out times per job from ServiceM8
  • Hourly rate plus super and on-costs, set once per person
  • Hours over the quote shown per job
04

Bills without a job, caught the same morning

Some invoices come in with the wrong PO, a van stock code, or nothing at all. Instead of letting them sit in Xero as overhead, we list them for the office each morning with the likely job beside each one, picked from the supplier, the delivery address and the items. One click assigns it.

  • Likely job suggested from supplier, address and items
  • Van and stock purchases kept out of job costs
  • Nothing posts to a job until a person confirms the guess
05

Margin per job, every Monday

One email with every open and recently finished job: quoted, billed, costs to date and margin. It is built from Xero, so it agrees with your accountant, and from ServiceM8, so it knows which job each cost belongs to. The jobs that are slipping sit at the top.

  • Margin per job from Xero actuals, not the quote
  • Jobs over budget listed first
  • Figures that reconcile to the Xero profit and loss

Running something else? Same build.

  • MYOB
  • TTradify
  • sPsimPRO
  • FFergus
  • AAroFlo

Xero Payroll and Deputy for labour, your wholesalers for bills, and HubSpot if your sales team lives there. On MYOB Business instead of Xero? The job side stays the same and the ledger side changes.

Read this before you pay.

Some of this you can get without us. The rest is where the money goes. Both are written down so you can decide before the call.

What ServiceM8 already does

ServiceM8's Xero integration sends invoices, syncs payments both ways, keeps customers and items in step and, in Australia, sends shift times to Xero as timesheets. Its add-ons raise partial invoices, read emailed supplier invoices onto the job, and show job costing inside ServiceM8 on Premium plans. If that covers you, use it. We build this when costs have to reach Xero against the right job and the margin has to agree with the books.

What we will not do

Rewrite invoices ServiceM8 has already sent to Xero. The built-in sync owns those. Our connection adds bills, labour and tracking around them, and it never edits or voids a document it did not create.

What this will not fix

Connecting ServiceM8 and Xero gives you hours back. It does not make the phone ring. If enquiries are the problem, the work is on the other side of the business.

What we do, in the order we do it.

ServiceM8 to Xero is usually live in 2 to 4 weeks. The slow part is agreeing what maps to what, not the build.

Week 1

Map the costs

Which Xero accounts your materials, subcontractors and labour belong in. Whether jobs are tracked with a tracking category or Xero Projects. Where your staff write the job number when they buy. One session with the office and the bookkeeper.

Every step above is work you can check. Ask any provider to show you the same list for what they are doing.

Absolutely brilliant! Lee is extremely knowledgeable, not just in making websites, but also in business strategy and he has really helped me with both my website and to improve my business in general. Fantastic results! Anyone who is looking to take their business to the next level or just have it be more professional should definitely talk to Lee!
DMDigby MarschallGoogle review
Automatrix made it so easy for me to develop what I required for my business. Their professionalism and knowledge is outstanding. Go with them. Best decision you could do for your business.
MTMat ThomasGoogle review
Lee has helped me heaps with improving my business, 10/10 recommend, easy to talk to and very knowledgeable.
PTPeter TravGoogle review
We recently used Automatrix to re-build our website. The new site is great with a simple admin panel that has everything we need when updating our site. The SEO/AEO is really performing as well. The guys are always Helpful when we need them and are always on the front foot with updates etc.
SCSean CalleyGoogle review
Not getting your website AI ready is going to be the same as forgetting to renew your Yellow Pages spot back in the 80s. One month after launching we can already see a big improvement in traffic and enquiries through search.
NMNicolas MazzellaGoogle review
Absolute gun at making websites. Lee helped me the whole way to complete the exact website I wanted and further in every way he could. Legit can’t even write how much I appreciate this guy. A+
JSJames SmeatonGoogle review

Questions about ServiceM8 to Xero.

Something else? Ask it on the free audit call, or read how we approach systems integration.

Does ServiceM8 do job costing with Xero?

Partly. ServiceM8's Job Costing add-on shows estimated and actual profit inside ServiceM8, and its Xero sync sends invoices and payments. What it does not do is put supplier bills and labour into Xero against each job. That is the gap this connection fills, so job profit in Xero matches the ledger.

Can supplier invoices reach Xero as bills coded to the ServiceM8 job?

Yes. Each emailed supplier invoice is read, matched to a job by its PO number, and drafted in Xero as a bill with the job tracking set and the PDF attached. Drafts wait for approval unless you ask for regular suppliers to be approved automatically.

How do progress payments work between ServiceM8 and Xero?

ServiceM8's partial invoicing add-on raises each claim, and the invoice syncs to Xero as normal. We add the running position per job: quoted, invoiced, paid and left to bill, with a warning when a variation has not been invoiced before the final claim goes out.

Should jobs be tracked in Xero with tracking categories or Xero Projects?

Either works. A job tracking category suits a steady flow of short jobs and keeps reports simple. Xero Projects suits longer jobs with budgets. Xero allows only two active tracking categories, so if both already hold something else, we plan around that on the audit call.

Will this double up with ServiceM8's own Xero sync?

No. ServiceM8 keeps sending its invoices and payments. Our connection only creates bills and labour postings, and it checks Xero for a bill with the same supplier and invoice number before drafting one, so a resent PDF never becomes a second bill.

We use MYOB, not Xero. Same thing?

The ServiceM8 side does not change. MYOB Business takes purchase bills and job codes through its own API, and MYOB jobs map neatly to ServiceM8 job numbers, so the build is the same shape with a different ledger behind it.

What does it cost?

ServiceM8 to Xero job costing starts from $2,500 for supplier bills coded to the job and a weekly margin report. Adding progress invoice tracking, labour costed from check-ins and a second Xero tracking set-up takes it toward $6,000. Most go live within two to four weeks, and monitoring afterwards can be cancelled at any time.

Get your free integration audit.

We look at the tools you run and where the same details get typed twice, then go through it with you on a 30 minute call. You get a map of what should move between them, which join to build first, and a fixed price. The map is yours to keep, whether or not you use us.

What you get before you pay us anything

  1. Every tool you run, and what it holds. On one page.
  2. Each handoff where data gets retyped. With who does it and how often.
  3. What connects to what. And what will not, because the software has no way in.
  4. The order to build in. Ranked by hours saved.
  5. A scope and a fixed price. Build it yourself, hand it to someone else, or hand it back to us.
Lee Sheedy, Founder and Director at Automatrix

Lee SheedyFounder and Director, Automatrix

5.0 on Google

Step 1 of 4

Start with your website

We look at it before the call, so we already know what you run.

You approve the scope and the price before we build. Each connection runs in your accounts. Prefer to talk first? Book a 30 minute call.